A dry type transformer impedance value may occupy only one line on a technical datasheet, but it influences several major system calculations at the same time.
Lower impedance generally improves voltage performance under load, but it allows higher short-circuit current. Higher impedance limits fault current, but it can increase voltage drop and deepen voltage dips during motor starting.
If two transformers are expected to operate in parallel, impedance also determines how the load divides between them.
The engineering question is therefore not:
“What is the normal impedance for this transformer?”
It is:
What impedance allows the transformer, switchgear, protection system and connected loads to operate together within the project requirements?
For EPC projects, this decision should be made before the transformer winding design is frozen.
1. Transformer Impedance Is a System Parameter, Not a Catalogue Preference
Transformer percent impedance, normally written as Z%, represents the voltage required to circulate rated current through the transformer when the opposite winding is short-circuited under defined test conditions.
For example, a transformer with 6% impedance requires approximately 6% of rated voltage during the impedance measurement to produce rated current.
The figure is largely determined by the transformer winding geometry and leakage flux, although winding resistance also forms part of the total impedance.
This parameter affects:
-
prospective secondary short-circuit current;
-
voltage drop under load;
-
motor-starting voltage dip;
-
LV switchgear fault duty;
-
busbar short-time withstand requirements;
-
protection coordination;
-
parallel-transformer load sharing.
For that reason, a manufacturer should not replace a specified 6% design with 4%, 5% or another value merely because it is a normal factory configuration.
The electrical system was often calculated around the specified value.
2. Z%, R% and X% Are Not the Same Thing
Total transformer impedance contains two components:
Resistance, R, associated mainly with winding resistance and load losses.
Reactance, X, associated mainly with leakage flux between the windings.
They are related approximately by:
Z² = R² + X²
For many distribution transformers, reactance forms the larger part of the total impedance.
This distinction matters because two transformers can have the same Z% but somewhat different resistance-to-reactance relationships.
For basic fault-current estimation, total Z% may be sufficient.
For voltage regulation, detailed load-flow calculations and precise parallel load sharing, the impedance angle or X/R relationship can also matter.
A project specification should therefore treat impedance as an electrical design parameter rather than simply a nameplate percentage.
3. How Transformer Impedance Controls Short-Circuit Current
For a preliminary transformer-terminal calculation, with upstream system impedance neglected:
Isc ≈ Irated × 100 / Z%
This is a screening calculation, not a complete short-circuit study.
Illustrative Example
Consider a three-phase dry type transformer rated:
-
1600 kVA
-
11 kV / 0.4 kV
-
50 Hz
-
Dyn11
Its rated LV current is approximately:
1600 / (√3 × 0.4) ≈ 2309 A
If transformer impedance is 6%:
Isc ≈ 2309 × 100 / 6
≈ 38.5 kA
If impedance were 5%:
Isc ≈ 46.2 kA
If impedance were 8%:
Isc ≈ 28.9 kA
The example shows the trade-off clearly.
| Impedance | Approx. Transformer-Terminal Fault Current |
|---|---|
| 5% | 46.2 kA |
| 6% | 38.5 kA |
| 8% | 28.9 kA |
These values are illustrative.
A final system study must include relevant source impedance, cables or busducts, parallel sources, generators, motor contribution and the actual network configuration.
Why this matters to the LV switchboard
Suppose the transformer specification is changed from 6% to a significantly lower impedance after the LV switchboard has already been selected.
The available fault current can increase.
The engineer may then need to review:
-
circuit-breaker interrupting capacity;
-
LV switchboard short-time withstand;
-
busbar bracing;
-
protection settings;
-
arc-fault or arc-flash calculations where applicable.
A transformer parameter change can therefore create a switchgear problem even when transformer capacity and voltage remain unchanged.
4. Higher Impedance Is Not Automatically Better
Increasing impedance is an effective way to reduce transformer-contributed fault current.
That does not mean the highest practical impedance should be selected.
The same impedance that limits a fault also creates voltage drop when load current passes through the transformer.
A simplified voltage-regulation relationship for a lagging-power-factor load can be expressed approximately as:
Voltage Regulation ≈ R% × cosφ + X% × sinφ
The actual result depends on load level, power factor and transformer design.
Illustrative Example
Assume:
-
total impedance = 6%;
-
resistance component = 1%;
-
reactance component ≈ 5.92%;
-
load power factor = 0.8 lagging.
An approximate full-load regulation value is:
1 × 0.8 + 5.92 × 0.6
≈ 4.35%
This calculation is only an engineering illustration. Actual guaranteed values should come from the approved transformer design and project calculation.
The important point is that Z% alone does not completely describe operating voltage drop.
Load power factor and the R/X components also influence the result.
5. Motor Starting Can Change the Preferred Impedance
Industrial transformers often supply:
-
compressors;
-
pumps;
-
chillers;
-
conveyors;
-
crushers;
-
large induction motors.
During direct-on-line starting, motor current can temporarily be several times normal running current.
The resulting voltage dip depends on the combined impedance between the power source and the motor.
Transformer impedance is part of that path.
A high-impedance transformer may provide acceptable normal-load performance but produce an excessive voltage dip when a large motor starts.
Possible consequences include:
-
contactor drop-out;
-
PLC reset;
-
lighting disturbance;
-
reduced motor starting torque;
-
nuisance protection operation;
-
instability in sensitive process equipment.
For projects containing large motors, impedance should therefore be coordinated with a motor-starting study rather than selected only from the maximum fault-current requirement.
6. Parallel Transformers Make Impedance Matching More Critical
Two transformers do not share load simply because they have the same rated voltage and kVA.
Parallel operation normally requires coordination of parameters including:
-
voltage ratio;
-
tap position;
-
vector group and phase displacement;
-
phase sequence;
-
frequency;
-
impedance magnitude;
-
impedance angle;
-
rated capacity.
The detailed requirements should be verified against the approved system design and applicable specification.
Why impedance mismatch causes unequal loading
With comparable secondary no-load voltages, parallel transformer currents divide approximately inversely to their internal impedances.
The transformer with the lower impedance carries more load.
Illustrative Example
Consider two transformers:
Transformer A:
-
1000 kVA
-
6% impedance
Transformer B:
-
1000 kVA
-
5% impedance
Assume their voltage ratios, vector groups, tap positions and impedance angles are otherwise suitable for parallel operation.
At a total load of 2000 kVA, approximate sharing based only on impedance magnitude becomes:
Transformer A ≈ 909 kVA
Transformer B ≈ 1091 kVA
The 5% transformer can therefore exceed its 1000 kVA rating before the combined system reaches what appears to be its nominal 2000 kVA capacity.
This is one reason parallel-transformer specifications should not simply state:
“Both transformers are 1000 kVA.”
The existing unit's actual nameplate and preferably its certified test data should be reviewed before the replacement or additional transformer is designed.
Different transformer ratings
Transformers with different kVA ratings can sometimes operate in parallel.
For correct proportional load sharing, their per-unit impedances and impedance angles require suitable coordination on their respective rating bases.
This should be calculated for the specific combination rather than judged from kVA alone.
7. How Should an EPC Engineer Select the Required Impedance?
A useful selection process starts with the network, not the manufacturer's standard design.
Step 1: Establish the maximum fault level
Calculate prospective fault current at the LV bus.
Review:
-
utility or upstream source fault level;
-
upstream transformer impedance;
-
MV feeder impedance;
-
dry transformer impedance;
-
LV cable or busduct impedance;
-
parallel sources;
-
generator and motor contributions where applicable.
The selected transformer impedance must keep system fault duty within the ratings of the connected equipment.
Step 2: Check minimum fault current
Protection also has to operate reliably at lower fault levels.
A design should not consider only the maximum current.
Minimum network configuration, long feeders and high impedance can influence protection sensitivity and clearing time.
Step 3: Check normal operating voltage
Evaluate transformer voltage regulation at realistic load levels and power factors.
Do not assess the transformer in isolation.
The customer ultimately sees voltage at the load terminals, so cable and busduct voltage drop should also be considered.
Step 4: Check motor starting and transient loads
Large motor, compressor, pump, UPS or process loads can make voltage-dip performance more restrictive than steady-state voltage regulation.
Step 5: Review parallel operating conditions
If parallel operation is planned now or may be required later, freeze:
-
voltage ratio;
-
vector group;
-
tapping arrangement;
-
impedance target;
-
applicable impedance tolerance;
-
load-sharing requirements.
For a replacement transformer, provide the existing transformer nameplate and test report whenever available.
Step 6: Confirm manufacturing feasibility
Transformer impedance is influenced by winding dimensions, spacing, conductor arrangement and leakage-flux design.
A project-specific impedance requirement may therefore change:
-
winding geometry;
-
conductor arrangement;
-
transformer dimensions;
-
losses;
-
short-circuit forces;
-
manufacturing cost.
The target value should be agreed before detailed design rather than changed after winding production begins.
8. What Should Be Included in the RFQ?
For an impedance-sensitive project, an RFQ should provide more than rated kVA.
Recommended information includes:
-
rated capacity;
-
primary voltage;
-
secondary voltage;
-
frequency;
-
vector group;
-
tap range and tap step;
-
required impedance or impedance range;
-
tapping position at which impedance is specified;
-
system maximum fault level;
-
LV switchboard fault rating;
-
major motor loads where relevant;
-
planned parallel-operation conditions;
-
existing-transformer data for retrofit projects;
-
applicable IEC standard;
-
routine-test requirements;
-
FAT witness requirements.
A single-line diagram is particularly useful because it allows the transformer manufacturer to understand where the transformer sits within the complete network.
9. Impedance Should Be Frozen Before Commercial Comparison
Procurement teams sometimes compare two quotations with the same:
-
kVA;
-
voltage ratio;
-
vector group;
-
enclosure;
-
winding material.
One quotation may still use a different impedance.
The offers are then not technically equivalent.
A lower impedance can change fault-current calculations.
A higher impedance can change voltage performance.
Different impedance may also prevent satisfactory parallel operation with an existing transformer.
For tender comparison, guaranteed impedance should appear on the technical datasheet or deviation schedule before price comparison is finalized.
This is particularly relevant where a manufacturer is proposing its normal design instead of the consultant's specified value.
10. What Should Be Verified During FAT?
Dry-type transformer projects commonly reference IEC 60076-11 together with applicable parts of the IEC 60076 series and the approved project specification.
The routine factory test programme should distinguish between:
Measurement of short-circuit impedance and load loss
and
Short-circuit withstand verification.
They are not the same test.
Impedance and load-loss measurement verifies the manufactured electrical characteristics of the transformer.
A physical short-circuit withstand test concerns the transformer's ability to withstand severe external-fault stresses and should not be assumed to be a routine FAT test on every production unit.
For impedance verification, the FAT documentation should identify as applicable:
-
transformer serial number;
-
rated power;
-
HV/LV voltage;
-
test tapping position;
-
test current;
-
measured impedance;
-
guaranteed impedance;
-
applicable tolerance;
-
measured load loss;
-
test reference conditions.
For transformers intended to operate in parallel, compare the measured impedance results between units rather than reviewing each report separately.
11. Two Typical Project Decisions
Scenario A: Large Indoor LV Distribution System
A 1600 kVA dry transformer feeds a large 400 V switchboard.
The initial transformer design has relatively low impedance.
The fault-current study shows that downstream switchgear duty is becoming restrictive.
Increasing transformer impedance may reduce the required fault level, but the engineer must then recheck:
-
operating voltage;
-
motor starting;
-
busduct voltage drop;
-
protection coordination.
The correct result is not the highest impedance.
It is the lowest-risk system compromise.
Scenario B: Factory Expansion With an Existing Transformer
A factory plans to add a new 1250 kVA dry transformer beside an existing 1250 kVA unit and operate both on a common LV bus.
A new transformer with the same 11/0.4 kV ratio and Dyn11 vector group is not automatically compatible.
The technical review should compare:
-
measured voltage ratio;
-
tapping arrangement;
-
impedance;
-
impedance angle;
-
phase relationship;
-
available fault current when both transformers are connected.
For this project, the existing transformer test report may be more valuable than a generic catalogue sheet.
FAQ
What impedance is normally used for a dry type transformer?
There is no universal value. Values such as 6% are frequently encountered in distribution specifications, but required impedance depends on transformer rating, voltage, fault level, voltage-drop requirements, motor starting and parallel-operation conditions.
Does higher transformer impedance reduce short-circuit current?
Yes. With other system parameters unchanged, higher transformer impedance reduces the transformer contribution to secondary fault current.
Does higher impedance increase voltage drop?
Generally yes. The effect depends on load current, power factor and the resistance/reactance components of the transformer impedance.
How do I calculate transformer secondary short-circuit current?
For a preliminary transformer-only estimate:
Isc ≈ Irated × 100 / Z%
A final short-circuit study must include the complete network impedance and relevant fault-current contributions.
Can a 5% impedance transformer operate in parallel with a 6% transformer?
Possibly, but equal voltage ratio and vector group do not guarantee satisfactory load sharing. The lower-impedance transformer tends to carry more current. The actual combination should be checked using the transformer ratings, complex impedances, tap positions and project requirements.
Must parallel transformers have exactly the same kVA rating?
No. Different ratings can sometimes operate in parallel, but their per-unit impedances, voltage ratios, vector groups and impedance angles must allow acceptable proportional load sharing.
Is transformer impedance verified during FAT?
Yes, short-circuit impedance and load loss can be measured as part of the transformer factory test programme according to the applicable standard and approved test scope.
Is the impedance test the same as an IEC 60076-5 short-circuit withstand test?
No. Impedance measurement determines electrical characteristics under reduced-voltage short-circuit test conditions. A physical short-circuit withstand test evaluates the transformer's ability to survive severe external-fault stresses and is a different test requirement.
CTA
If you are preparing a dry type transformer RFQ, provide the rated capacity, primary and secondary voltage, frequency, vector group, target impedance, system fault level, LV switchgear rating and any planned parallel-operation requirements.
For replacement or parallel projects, include the existing transformer nameplate and available test report. The impedance requirement can then be reviewed against short-circuit current, voltage performance and load-sharing conditions before the transformer design and quotation are finalized.