Leave Your Message
News Categories
Featured News

Dry Type Transformer Parallel Operation: Ratio & Impedance

2026-09-24

Parallel Operation Is More Than Connecting Two Transformers to One Bus

Two dry-type transformers may be installed on a common LV bus to increase available capacity, provide operational flexibility, support staged expansion or allow one transformer to be isolated during maintenance.

That does not mean two transformers with the same rated capacity can automatically be paralleled.

A controlled dry type transformer parallel operation design must review at least:

  • voltage ratio and actual tap position;
  • vector group and phase displacement;
  • polarity and phase sequence;
  • percentage impedance;
  • impedance angle or X/R relationship where accurate sharing matters;
  • rated capacity;
  • frequency;
  • LV cable or busbar impedance between each transformer and the common bus.

Industry guidance consistently identifies voltage ratio, phase relationship and relative short-circuit impedance as major conditions for successful parallel operation.

The practical engineering problem is simple:

If the secondary voltages are not equal, current can circulate between the transformers before useful load current is supplied.

If the impedances are not properly matched, the transformers will not share load according to their ratings.

Both problems can leave one transformer overloaded while the total connected bank still appears to have spare nameplate capacity.

1.webp

The Main Conditions for Dry Type Transformer Parallel Operation

For a conventional three-phase distribution installation, the following parameters should be reviewed before closing the bus-tie or paralleling breaker.

Parameter Preferred Condition Main Risk if Incorrect
Frequency Same Incorrect operating conditions
Voltage ratio Same or sufficiently matched Circulating current
Tap position Coordinated Secondary voltage mismatch
Vector group Same for normal projects Phase-angle mismatch
Phase sequence Same Incorrect phase relationship
Polarity Correct Severe circulating/fault current
% impedance Closely matched Unequal load sharing
X/R relationship Similar where practical Unequal kW/kvar sharing
Rated capacity May differ if properly engineered Improper utilization
LV connection impedance Consider actual installation Load-sharing deviation

Schneider Electric's published guidance similarly identifies ratio, phase-angle relation and relative short-circuit impedance as key paralleling parameters.

The word "same" should not be interpreted as permission to assume compatibility from two nameplates that look similar. Actual test values, tap positions and system connections need to be reviewed.

Voltage Ratio and Tap Position: Why Small Differences Matter

For two transformers connected to the same primary system and common secondary bus, their no-load secondary voltages should be closely matched.

Suppose Transformer A produces a slightly higher secondary EMF than Transformer B.

Once the LV terminals are connected together, the voltage difference drives current through the internal impedances of both transformers.

A simplified no-load expression is:

Ic ≈ (E1 − E2) / (Z1 + Z2)

where:

Ic = circulating current
E1 and E2 = secondary no-load EMFs
Z1 and Z2 = equivalent transformer impedances

The current exists even when the external load is zero. The general transformer parallel-operation circuit equations separate transformer current into a load-sharing component and a circulating-current component.

Simplified Engineering Example

Consider two equal 1000 kVA transformers:

Transformer A: 11/0.4 kV, approximately 6% impedance
Transformer B: 11/0.4 kV, approximately 6% impedance

Assume their actual secondary no-load voltages differ by approximately 1%.

Using a simplified per-unit screening calculation:

Circulating current ≈ 0.01 / (0.06 + 0.06)

≈ 0.083 pu

≈ 8.3% of rated current

This is not a final protection-study calculation. Feeder impedance, transformer impedance angle and measured voltage values must be considered in a detailed study.

It demonstrates why a seemingly small voltage mismatch cannot simply be ignored.

Tap Position Must Be Checked

A common retrofit mistake is:

  • existing transformer operating on one tap;
  • new transformer delivered with the same nominal nameplate voltage;
  • new unit energized on a different tap.

The nameplates may both state 11/0.4 kV, yet their effective transformation ratios at the operating taps can differ.

Before paralleling, record the actual tap position of every unit.

For transformers equipped with automatic voltage regulation, the control philosophy also requires engineering review so that two regulators do not continuously oppose each other.

2.webp

Vector Group Is a Connection Requirement, Not a Catalogue Detail

The transformer vector group identifies winding connection and phase displacement between HV and LV voltages.

Dyn11, for example, does not mean the same electrical relationship as Dyn1.

For normal EPC procurement, transformers intended for parallel operation should be specified with the same vector group.

Schneider Electric explicitly notes that mismatched vector groups create different phase relationships and can produce circulating current and system disturbance.

The engineering check should cover:

vector group → phase displacement → terminal identification → polarity → phase sequence

Do not approve parallel connection only because both transformers are three-phase and have identical voltage ratings.

Special connection arrangements between different groups may be technically possible in specific engineered systems, but they should be treated as exceptions requiring a detailed connection study rather than a normal procurement assumption.

Transformer Impedance Controls How the Load Is Shared

Once voltage ratio and phase relationship are compatible, transformer impedance becomes the major parameter controlling load distribution.

For two transformers with equal secondary EMFs:

I1 / I2 = Z2 / Z1

The lower-impedance transformer takes the larger share of the load.

For transformers with different ratings, a practical load-sharing expression using each unit's percentage impedance is:

Share of Transformer 1

= (S1 / Z1%) ÷ [(S1 / Z1%) + (S2 / Z2%)]

where S1 and S2 are transformer rated kVA values.

This assumes compatible voltage ratios and similar impedance angles.

Example 1: Two Equal-Rating Transformers with Different Impedance

Transformer A:

1000 kVA
5% impedance

Transformer B:

1000 kVA
6% impedance

Total bank load:

2000 kVA

Load-sharing weights are:

A = 1000 / 5 = 200

B = 1000 / 6 = 166.7

Transformer A carries approximately:

200 / 366.7 × 2000

≈ 1091 kVA

Transformer B carries approximately:

166.7 / 366.7 × 2000

≈ 909 kVA

The installed capacity appears to be:

2000 kVA

but Transformer A is already at approximately:

109% loading

while Transformer B remains below its rated capacity.

The bank therefore cannot use its full 2000 kVA nameplate total continuously under this simplified loading condition.

Transformer A reaches 1000 kVA when total bank loading is only about:

1833 kVA

This is why different percentage impedances can reduce the usable capacity of a parallel transformer bank. Published manufacturer guidance shows the same engineering effect: the lower-impedance unit reaches its loading limit first, reducing the usable combined rating.

3.webp

Equal Percentage Impedance Allows Proportional Sharing

Now consider:

Transformer A: 1000 kVA, 6% impedance
Transformer B: 1250 kVA, 6% impedance

Their load-sharing weights are:

1000 / 6 = 166.7

1250 / 6 = 208.3

The resulting distribution is approximately:

Transformer A: 44.4%
Transformer B: 55.6%

Those percentages match their rated-capacity proportions.

For a 2250 kVA total bank load:

Transformer A ≈ 1000 kVA
Transformer B ≈ 1250 kVA

This illustrates an important engineering rule:

Transformers do not have to have identical kVA ratings to operate in parallel.

What matters is whether their voltage relationship, phase relationship and impedance characteristics permit acceptable load sharing.

Very large differences in transformer ratings deserve extra review because optimized impedance values and operating characteristics can differ between designs. Schneider guidance, for example, discourages widely different ratings such as ratios beyond roughly 2:1 as a general practice, but this should be treated as manufacturer guidance rather than a universal project limit.

Matching %Z Alone Is Not the Complete Impedance Check

Two transformers may both show 6% impedance while their impedance angles differ.

Transformer impedance contains:

Z = R + jX

If the X/R characteristics differ significantly, current magnitude and power-factor sharing can depart from the simple proportional calculation.

For preliminary EPC screening, matching percentage impedance is normally the first check.

For critical systems, larger transformers or unusual designs, request:

  • measured short-circuit impedance;
  • rated kVA base;
  • tapping position used for the test;
  • load loss;
  • winding resistance;
  • impedance tolerance;
  • design or test information needed to assess impedance angle.

The impedance of external LV connections should also be considered.

A transformer connected to the switchboard through a short busduct does not have exactly the same total path impedance as another transformer connected through a long cable run.

The electrical system sees:

transformer impedance + connection impedance

not the transformer nameplate alone.

4.webp

Adding a New Dry-Type Transformer Beside an Existing Unit

This is one of the highest-risk parallel-operation procurement scenarios.

An industrial plant may have an existing 1000 kVA dry-type transformer and need another 1000 kVA unit because production capacity is expanding.

Sending a supplier only:

“1000 kVA, 11/0.4 kV, please quote one transformer for parallel operation”

is not enough.

Before the new transformer is designed, provide:

  • existing transformer nameplate;
  • rated capacity;
  • HV and LV rated voltage;
  • frequency;
  • vector group;
  • percentage impedance;
  • actual tap position;
  • complete tap range;
  • available FAT or routine test report;
  • winding material if specified;
  • neutral and earthing arrangement;
  • LV termination arrangement;
  • single-line diagram;
  • busduct or cable information where relevant.

If the old transformer has been operating for many years, do not rely only on catalogue data if actual test documentation is available.

Parallel compatibility is a system requirement, not merely a request for another transformer with similar catalogue parameters.

Procurement Risk: "Same Model" Does Not Guarantee Parallel Compatibility

Two transformers can both be described commercially as:

1000 kVA
11/0.4 kV
Dyn11
dry type

and still require engineering review.

Their actual designs may have different:

  • impedance values;
  • impedance tolerances;
  • tap arrangements;
  • no-load voltage values;
  • winding resistance;
  • terminal configurations;
  • production standards or project specifications.

This matters especially when the transformers come from different manufacturers or production periods.

For replacement and expansion projects, the supplier should review the existing unit before the new transformer design is frozen.

What Should Be Verified During FAT?

IEC 60076-11:2018 applies specifically to dry-type power transformers within its stated scope, while IEC 60076-1 provides general transformer requirements.

For a transformer intended for parallel operation, the approved FAT and test documentation should provide enough evidence to verify the relevant electrical characteristics.

The project should pay particular attention to:

  • voltage ratio;
  • phase displacement / connection symbol;
  • winding resistance;
  • short-circuit impedance;
  • rated voltage and tap data;
  • nameplate information.

The exact classification and scope of routine, type and special tests should follow the applicable IEC standard and approved project specification.

Do not describe every possible test as mandatory for every production unit.

For a retrofit project, compare the new-transformer results against the existing-transformer data before site paralleling.

5.webp

Pre-Energization Checks at Site

Factory compatibility does not remove the need for site verification.

Before closing the parallel connection, the commissioning team should confirm:

  1. Correct HV source and frequency
  2. Correct tap positions
  3. Correct phase sequence
  4. Correct LV terminal identification
  5. Compatible phase displacement
  6. Correct polarity
  7. Acceptable secondary voltage difference
  8. Correct bus-tie and protection arrangement
  9. CT and relay polarity where applicable
  10. Protection settings for parallel and single-transformer operating modes

The bus should not be closed first and investigated afterward if there is uncertainty about phase relationship.

What Should Be Included in the RFQ?

For a new parallel dry type transformer, send the manufacturer:

Rated capacity
Primary voltage
Secondary voltage
Frequency
Vector group
Required percentage impedance
Tap range and operating tap
Cooling method
Enclosure/IP requirement
Site ambient temperature
Altitude
Applicable IEC standard
Existing transformer nameplate
Existing transformer test report, if available
Single-line diagram
Required FAT documentation
Quantity
Destination country

For a greenfield project with two new transformers, state clearly that both units are intended for parallel operation.

This allows the manufacturer to coordinate the design instead of treating them as unrelated transformers.

6.webp

FAQ

1. Can two dry-type transformers of different kVA ratings operate in parallel?

Yes, provided voltage ratio, phase relationship, tap arrangement and impedance characteristics permit acceptable load sharing. Equal percentage impedance on each transformer's own rating base helps the transformers share load in proportion to their capacities.

2. Do parallel transformers have to use the same vector group?

For normal three-phase projects, specify the same vector group. A phase-displacement mismatch can create severe circulating current or prevent safe parallel connection.

3. What happens if two transformers have different percentage impedance?

The lower-impedance transformer generally carries more load. It may reach rated current before the other transformer, reducing the usable combined capacity of the bank.

4. Can a 5% impedance transformer operate in parallel with a 6% transformer?

Possibly, but it should not be approved from those two numbers alone. Calculate expected load sharing and check impedance tolerance, rating, impedance angle, voltage ratio, tap position and project loading.

5. Why does voltage ratio mismatch create circulating current?

When two paralleled transformers produce different secondary EMFs, the voltage difference drives current around the closed transformer-secondary circuit even without an external load.

6. Can transformers from different manufacturers operate in parallel?

Yes, manufacturer identity is not the deciding parameter. Compatibility must be demonstrated using actual electrical characteristics such as voltage ratio, vector group, phase sequence, polarity and impedance.

7. Should the existing transformer test report be sent when ordering an expansion unit?

Yes. For retrofit projects, the existing nameplate, test report, tap arrangement and single-line diagram give the new supplier much stronger engineering data than a basic kVA and voltage description.

8. Is the combined rating always equal to the sum of both transformer ratings?

No. Significant impedance mismatch can cause one transformer to reach rated load before the other, reducing the usable bank capacity.

Call To Action

If you are preparing an RFQ for dry-type transformers that will operate in parallel, provide the rated capacity, primary and secondary voltage, frequency, vector group, impedance, tap range and operating tap for each unit.

For expansion or replacement projects, also provide the existing transformer nameplate, test report and single-line diagram.

The electrical compatibility and expected load distribution can then be reviewed before the new transformer specification and quotation are finalized.

Make an free consultant

Your Name

Phone Number*

Country*

Remarks

reset