Temperature is one of the most useful operating indicators available on a dry-type transformer, but a complete dry type transformer temperature monitoring system does much more than display a number on a panel.
A typical system may include PT100 resistance temperature detectors, a digital temperature controller, cooling-fan outputs, high-temperature alarm contacts, trip contacts and communication interfaces to a PLC, BMS or SCADA system.
For an EPC engineer or transformer buyer, the key question is not simply whether a temperature controller is included. The specification should define what is measured, where the sensors are located, how the controller responds, which signals are available remotely and how the complete control chain will be verified during FAT and commissioning.
Temperature Monitoring Is a Protection and Control System
The monitoring chain can be represented as:
Winding temperature → PT100 sensor → temperature controller → control logic → fan / alarm / trip / remote monitoring
Each part matters.
A PT100 may be installed correctly while the alarm contact is wired incorrectly. The controller may display temperature normally while the cooling-fan circuit is unavailable. The fan circuit may operate correctly while the trip relay has never been function-tested.
For this reason, temperature monitoring should be treated as an integrated auxiliary protection and control system rather than a standalone display instrument.
Commercial dry-type transformer monitoring units commonly provide three or four PT100 inputs and separate functions for fan control, alarm and trip. Remote-capable versions may also provide analog or Modbus communication.
What Does a PT100 Sensor Measure?
A PT100 is a platinum resistance temperature detector, or RTD. Its electrical resistance changes predictably with temperature.
IEC 60751 defines requirements and the resistance-versus-temperature relationship for industrial platinum resistance temperature sensors.
In a dry-type transformer, PT100 probes are commonly used to monitor winding temperature. A typical three-phase arrangement uses one sensing point for each phase, although the exact number and location depend on the transformer design and project specification.
Some monitoring systems provide a fourth channel for another measurement point, such as core or ambient temperature.
PT100 Reading Is Not Automatically the True Winding Hot Spot
This distinction is important.
A PT100 measures the temperature at the physical location of its sensing element. It does not mathematically guarantee measurement of the absolute hottest point anywhere inside the winding.
The actual winding hot spot can be influenced by:
-
current distribution;
-
winding geometry;
-
cooling-air path;
-
enclosure;
-
harmonics;
-
local losses;
-
ambient temperature;
-
sensor position.
Therefore, the value shown on the controller should be interpreted as the temperature at the designed monitoring point.
For project specifications where direct internal hot-spot measurement is critical, the sensing arrangement needs to be reviewed separately rather than assuming a standard PT100 configuration measures every possible local hot spot.
This distinction also separates temperature monitoring from a transformer temperature-rise test. Operational PT100 monitoring supervises the transformer in service, while a temperature-rise test evaluates thermal performance under specified test conditions.
Where Are PT100 Sensors Installed?
Sensor position is determined by the transformer winding design.
In many cast-resin dry-type transformer configurations, PT100 probes are incorporated into designated winding temperature-measurement locations during manufacture. They should not be treated as field accessories that can always be inserted arbitrarily after the transformer is completed.
The buyer should confirm:
-
number of PT100 sensors;
-
monitored phases;
-
sensor location;
-
sensor type;
-
cable construction;
-
termination method;
-
spare sensor requirement;
-
controller input compatibility.
The sensor arrangement should appear consistently across the technical datasheet, wiring diagram and accessory schedule.
Why Three-Wire PT100 Connections Are Common
A three-wire RTD arrangement allows the measurement circuit to compensate for much of the resistance introduced by sensor leads.
This becomes relevant when the controller is installed at a distance from the sensor or when relatively long control wiring is used.
The controller, sensor and wiring configuration must therefore be treated as a matched system.
From PT100 to the Temperature Controller
The transformer temperature controller receives resistance signals from the PT100 probes and converts them into temperature values.
Depending on the selected controller, functions may include:
-
individual phase temperature display;
-
maximum winding temperature display;
-
fan control;
-
high-temperature alarm;
-
overtemperature trip output;
-
sensor open-circuit or fault indication;
-
maximum-temperature memory;
-
remote analog signal;
-
RS485 / Modbus communication.
Representative commercial devices show this architecture clearly: separate PT100 inputs are processed by programmable control logic and connected to fan, alarm and trip relay outputs.
The controller itself should therefore be included in the transformer auxiliary control documentation rather than listed only as a generic accessory.
Fan, Alarm and Trip Should Be Separate Control Levels
A practical control philosophy normally separates thermal response into several stages.
| Control Level | Purpose | Typical Action |
|---|---|---|
| Normal operation | Monitor thermal condition | Temperature display / remote monitoring |
| Fan start | Increase cooling | Start forced-air fans where AF cooling is provided |
| Fan stop | Return to normal cooling | Stop fans after temperature falls sufficiently |
| High-temperature alarm | Warn operator | Alarm relay / SCADA indication |
| Overtemperature trip | Protect transformer | Trip signal to upstream switching device where specified |
| Sensor/controller fault | Detect monitoring failure | Fault alarm or remote indication |
These functions should not be combined casually.
A fan start signal is not equivalent to an overtemperature alarm. An alarm is not automatically a breaker trip. A trip output from the controller also does not disconnect the transformer by itself unless the external protection circuit has been designed and wired to act on the appropriate switching device.
Why Fan Start and Stop Need Hysteresis
If a fan were switched on and off at exactly the same temperature, small fluctuations around the setpoint could cause repeated contactor operation.
A practical controller therefore uses separate start and stop thresholds or an equivalent hysteresis function.
The logic can be expressed conceptually as:
Temperature rises → fan starts at Tfan-on
Temperature falls → fan stops at Tfan-off
where:
Tfan-off < Tfan-on
The actual values must follow the approved transformer design and project specification.
This logic reduces unnecessary switching and creates a stable forced-cooling operating band.
There Is No Universal Fan, Alarm or Trip Temperature
This is one of the most common specification mistakes.
Values such as a fan-start temperature, alarm temperature or trip temperature should not be copied from another transformer without engineering review.
Setpoints can depend on:
-
insulation system;
-
guaranteed temperature rise;
-
rated load;
-
ambient design condition;
-
cooling method;
-
winding construction;
-
sensor location;
-
enclosure;
-
manufacturer's thermal design;
-
project protection philosophy.
IEC 60076-11 addresses dry-type transformer thermal requirements within its scope, but a purchaser should not assume that the temperature class of an insulation system directly equals the appropriate controller alarm or trip setpoint.
The correct approach is to request the manufacturer's recommended settings and review them against the approved project specification.
A datasheet should therefore define either:
-
approved temperature setpoints; or
-
a requirement for the manufacturer to submit recommended setpoints for approval.
How Temperature Monitoring Works with AN and AF Cooling
Under AN cooling, the transformer relies on natural air circulation.
Under AF cooling, fans increase airflow when forced cooling is required.
The temperature controller provides the link between thermal measurement and automatic fan operation.
A simplified AF sequence is:
PT100 detects rising winding temperature
→ controller reaches fan-start threshold
→ fan output relay operates
→ fan contactor energizes
→ forced airflow begins
When temperature decreases sufficiently:
controller reaches fan-stop threshold
→ fan output resets
→ fan contactor drops out
The transformer design should specify whether forced cooling changes the permissible operating capability. That capability must come from the approved manufacturer data rather than assuming that installing fans automatically allows a particular overload.
Alarm and Trip Logic Need Different Engineering Responses
A high-temperature alarm is generally intended to alert the operator that thermal conditions are approaching an unacceptable operating region.
The operating response may include checking:
-
transformer current;
-
load distribution;
-
room temperature;
-
ventilation;
-
cooling fans;
-
air filters or airflow restrictions;
-
harmonic loading;
-
enclosure ventilation.
A trip signal represents a higher protection level.
Where the project requires automatic disconnection, the trip relay is typically integrated into an external breaker or protection circuit.
The complete loop may therefore be:
PT100 → temperature controller → trip relay → control circuit → upstream breaker
Every interface in this chain should be shown on the approved wiring diagram.
Sensor Failure Must Also Be Considered
Temperature protection can become ineffective if the sensor circuit itself fails.
Possible problems include:
-
PT100 open circuit;
-
wiring short circuit;
-
loose terminal;
-
damaged sensor lead;
-
channel configuration error;
-
controller auxiliary-power failure;
-
incorrect phase identification.
Many industrial temperature controllers provide sensor-fault or self-diagnostic outputs. Representative transformer temperature monitoring devices specifically include automatic diagnostic or sensor-failure functions.
For critical installations, the specification should state whether controller or sensor failure must generate a remote alarm.
Remote Monitoring: Dry Contacts, 4–20 mA and Modbus
Temperature data often needs to leave the transformer enclosure.
Three common approaches are used.
Potential-Free Contacts
Relay contacts can provide discrete status such as:
-
fan running command;
-
high-temperature alarm;
-
trip;
-
controller fault.
These signals are easy to integrate into conventional protection and annunciation systems.
4–20 mA
Analog transmission can be specified when a PLC or monitoring system requires continuous temperature values through analog inputs.
RS485 / Modbus RTU
Digital communication can provide multiple temperatures, status information and alarms through a single communication interface.
Commercial monitoring units are available with Modbus RTU and analog outputs, but these functions should be specified explicitly rather than assumed to be standard accessories.
For EPC procurement, the RFQ should identify:
-
protocol;
-
baud rate or communication requirements;
-
register information;
-
communication terminal;
-
isolation requirements;
-
required signals;
-
BMS / SCADA interface responsibility.
Installation Errors Can Create Misleading Temperature Readings
A technically capable controller cannot compensate for poor installation.
Common issues include:
Incorrect Sensor Assignment
If Phase A, B and C channels are connected incorrectly, displayed values may still appear normal but fault diagnosis becomes unreliable.
Poor Terminal Connections
Loose connections in the low-level measurement circuit can create unstable or incorrect readings.
Incorrect RTD Wiring
A controller designed for a three-wire PT100 should be connected according to the manufacturer's wiring arrangement.
Electromagnetic Interference
Sensor cables should be routed according to the controller manufacturer's instructions and project control-wiring practice, particularly near high-current conductors or switching circuits.
Incorrect Auxiliary Supply
The temperature controller and fan contactors must be supplied at the voltage specified in the approved control schematic.
Unverified Fan Rotation or Airflow
An energized fan is not sufficient evidence of effective cooling. Rotation direction and airflow path should also be checked during commissioning.
What Should Be Tested During FAT?
Temperature monitoring deserves a functional FAT check rather than a visual inspection only.
Depending on the agreed FAT scope, checks can include:
| FAT Item | What Should Be Verified |
|---|---|
| PT100 channels | Correct channel identification and plausible readings |
| Controller display | Phase temperatures and maximum temperature |
| Fan start output | Relay operation at simulated threshold |
| Fan stop logic | Correct reset / hysteresis |
| Alarm output | Relay and terminal operation |
| Trip output | Relay and terminal operation |
| Sensor failure | Fault response where provided |
| Manual/automatic fan mode | Correct control behavior |
| Remote contacts | Continuity and terminal identification |
| Communication | RS485 / Modbus function where specified |
| Wiring diagram | Terminal numbers match actual construction |
Alarm, trip and fan outputs are standard capabilities on many dedicated transformer monitoring units, making functional simulation practical during control-system verification.
The FAT report should state what was actually tested.
A routine transformer electrical test and a functional accessory test are not the same activity, so temperature-controller testing should not automatically be described as an IEC routine test unless the applicable specification defines it as such.
Commissioning Checks After Installation
Site commissioning should verify that the monitoring system still operates correctly after transportation, installation and external control wiring.
The commissioning team should confirm:
-
PT100 values are reasonable and stable;
-
phase identification is correct;
-
controller settings match approved documents;
-
fans operate in automatic mode;
-
fan airflow direction is correct;
-
alarm signals reach the designated system;
-
trip circuit logic is correct;
-
SCADA/BMS communication operates where applicable;
-
auxiliary supplies are correct;
-
terminal labels match drawings.
A transformer can pass factory testing while an external trip or BMS interface remains incorrectly wired at site. The complete system therefore needs end-to-end verification.
What Should Be Included in a Transformer RFQ?
For a dry-type transformer project requiring temperature monitoring, avoid writing only:
“Temperature controller included.”
A more useful RFQ identifies the functional requirement.
The buyer should confirm:
-
transformer rated capacity;
-
primary and secondary voltage;
-
vector group;
-
cooling method, AN or AN/AF;
-
enclosure requirement;
-
PT100 quantity and monitored locations;
-
temperature controller requirement;
-
fan start/stop function;
-
high-temperature alarm;
-
overtemperature trip contact;
-
controller/sensor-failure alarm;
-
required remote dry contacts;
-
4–20 mA requirement, if any;
-
RS485 / Modbus requirement, if any;
-
auxiliary control voltage;
-
FAT functional-test requirement;
-
required wiring diagrams and controller documentation.
This prevents a common commercial problem: two quotations may both state “temperature controller,” while their actual monitoring, communication and protection functions are different.
Documents to Review Before Production
The approved transformer package should keep the monitoring configuration consistent across several documents.
Review:
-
technical datasheet;
-
accessory list;
-
GA drawing where relevant;
-
control schematic;
-
terminal diagram;
-
temperature-controller datasheet;
-
communication documentation;
-
fan-control schematic;
-
FAT procedure.
The model number of the controller alone is not enough. The project team needs to understand the selected functions and how they interact with the transformer and external protection system.
Standards: What IEC 60076-11 and IEC 60751 Cover
IEC 60076-11:2018 applies to dry-type power transformers within its defined scope and addresses dry-type transformer design and performance requirements, including thermal aspects.
IEC 60751:2022 specifies requirements and resistance-temperature characteristics for industrial platinum resistance temperature sensors such as PT100 devices.
Neither reference should be used as a substitute for the approved project control philosophy.
Items such as:
-
number of monitoring channels;
-
alarm logic;
-
trip interface;
-
fan sequence;
-
communication protocol;
-
remote signals;
still need to be defined by the transformer design and project specification.
FAQ
1. Where are PT100 sensors installed in a dry-type transformer?
They are installed at designated winding temperature-measurement locations defined by the transformer design. A common three-phase configuration monitors one point per phase, but the exact sensor arrangement should be confirmed on the manufacturer's technical documentation.
2. Does a PT100 measure the actual winding hot-spot temperature?
It measures temperature at the sensor location. That location may be selected to represent winding thermal condition, but the reading should not automatically be interpreted as the absolute hottest point anywhere in the winding.
3. How many PT100 sensors does a dry-type transformer need?
Three winding channels are common for three-phase monitoring. Some systems use a fourth input for core, ambient or another project-specific point. The final configuration is manufacturer- and project-specific.
4. What temperature should start the cooling fans?
There is no universal fan-start value. It should be based on the transformer thermal design, insulation system, temperature rise, sensor location, cooling arrangement and approved manufacturer recommendations.
5. Should high temperature generate an alarm or trip?
Projects often use separate alarm and trip levels. Alarm warns the operator, while a higher protection level may initiate a trip signal. Whether automatic breaker tripping is required must be defined in the project protection philosophy.
6. Can the transformer temperature controller connect to SCADA?
Yes, if the selected controller provides the required interface. Common options include potential-free contacts, analog outputs and RS485/Modbus RTU. The required interface should be specified in the RFQ.
7. Should fan and alarm functions be tested during FAT?
If these functions are part of the ordered transformer package, functional verification should be included in the agreed FAT scope. The test can verify PT100 channels, fan outputs, alarm contacts, trip contacts, fault signals and communication where specified.
8. Is a temperature controller mandatory on every dry-type transformer?
The required monitoring and protection arrangement depends on transformer design, application and project specification. The EPC specification should clearly define the required sensors, controller functions and external interfaces rather than assuming identical accessories for every transformer.
CTA
If you are preparing a dry-type transformer RFQ, provide the rated capacity, primary and secondary voltage, vector group, impedance, cooling method, enclosure, required PT100 arrangement, alarm/trip signals, communication interface, quantity and destination country.
The temperature-monitoring configuration and control interface can then be reviewed together with the transformer technical datasheet and wiring requirements before quotation.