Dry Type Transformer Temperature Rise Limits Explained

2026-10-23

Dry Type Transformer Temperature Rise Limits: Ambient, Insulation and Load

A datasheet stating “Class F insulation, 100 K temperature rise” gives two different thermal characteristics. It does not mean that the winding operates at 100°C, and it does not establish a 155°C trip setting.

To interpret dry type transformer temperature rise limits, first identify what temperature is being evaluated, which service conditions apply and what the supplier has actually guaranteed. The same quoted limit can lead to different acceptance decisions when the project ambient, cooling arrangement or contractual requirement changes.

This article addresses air-cooled dry-type power transformers within the scope of IEC 60076-11. Its 2018 edition covers equipment with a highest voltage for equipment up to 72.5 kV and at least one winding operating above 1.1 kV, subject to the standard’s exclusions.

绝缘系统与温升保证-1.webp

Read the temperature quantity before comparing the number

Average winding temperature rise is the difference between average winding temperature and the reference cooling-air temperature:

Δθavg = θw,avg − θa

Here, θw,avg is average winding temperature and θa is the applicable cooling-air reference. Absolute temperatures are expressed in °C; the temperature difference is normally stated in kelvins, K. A rise of 100 K is numerically a 100°C difference, not an absolute temperature of 100°C.

The resistance method infers an average winding temperature from the change in conductor resistance. A PT100 instead measures temperature at its installed location. Subtracting ambient temperature from a PT100 reading gives a local temperature difference; it does not automatically produce the resistance-derived average required for a winding temperature-rise guarantee.

The winding’s hot-spot temperature is another quantity: the highest local temperature in the winding insulation system. An acceptable average does not, by itself, establish the temperature at every internal point. The relationship between the hot spot, the average and a sensor reading depends on the design and measurement arrangement. See the separate guide to PT100 temperature monitoring for operational measurement and control.

This distinction matters when a report contains several temperatures. Before comparing any result with a limit, establish whether it is an average winding rise, a sensor temperature, a hot-spot estimate or a surface measurement.

A temperature printed beside a load-loss value is different again. “Load loss at 120°C” identifies a loss reference temperature; it does not specify a 120 K winding-rise guarantee or the actual operating temperature at the site.

绕组测温位置特写-2.webp

Insulation class establishes a limit framework; the order establishes the guarantee

For normal service conditions, the following IEC 60076-11 values apply to two frequently specified insulation systems:

Insulation system thermal class Average winding temperature-rise limit at rated current
155, Class F 100 K
180, Class H 125 K

These are limits for average winding rise under the applicable standard test and service conditions. They are not controller setpoints or universal operating temperatures.

The class belongs to the insulation system, rather than to one selected material in isolation. Where HV and LV windings have different insulation systems or guarantees, check each winding separately.

A project may specify a lower rise than the normal class-based limit. A Class F transformer guaranteed at 80 K remains a Class F design; its contractual rise requirement is simply more restrictive than 100 K. Conversely, a Class H offer at 125 K is not automatically equivalent to a Class F offer at 80 K merely because its insulation class is higher.

A lower guaranteed rise can provide useful thermal margin, but it does not independently prove lower losses, higher efficiency or a stated service-life extension. Winding geometry, cooling surfaces and airflow also influence temperature rise. Evaluate the loss guarantees and thermal guarantees as separate, related requirements.

树脂浇注变压器冷却细节-3.webp

The ambient specification can change the allowable rise

The normal IEC air-temperature basis distinguishes three upper values:

  • 40°C maximum cooling-air temperature;
  • 30°C monthly average for the hottest month;
  • 20°C annual average.

The 30°C value is a monthly average, not a generic 24-hour average. A room held continuously at 40°C would exceed the monthly and annual reference values even though its instantaneous temperature never exceeded 40°C. Siemens’ published GEAFOL planning guidance identifies the same three conditions.

IEC 60076-11:2018, 10.2 requires the temperature-rise limit to be reduced by the excess cooling-medium temperature when the transformer is designed for higher ambient conditions. Consider a hypothetical specification in which all three upper values increase by 10°C, to 50°C maximum, 40°C hottest-month average and 30°C annual average. With no additional corrections, the corresponding Class F limit becomes 100 − 10 = 90 K; the Class H limit becomes 125 − 10 = 115 K.

This is a 10 K reduction in allowable rise. It is not a rule that the transformer’s kVA rating must fall by 10%. The manufacturer must establish a design or permissible loading that meets the corrected thermal requirement. An existing unit’s allowable output cannot be determined from that subtraction alone.

The arithmetic also explains why a high insulation class does not remove the ambient question. At a 40°C reference and 100 K average rise, the average winding temperature would be 140°C. Increasing the reference to 50°C while retaining 100 K would produce 150°C. Comparing that figure with the class designation does not establish conformity: the corrected rise limit and the separate hot-spot requirements still apply.

For an indoor installation, define the cooling-air reference consistently with the supplied transformer and enclosure. Outdoor weather data alone may not represent the air reaching the equipment. State the room conditions, enclosure arrangement and any recirculation or ventilation restrictions, and establish how enclosure heating is included in the thermal guarantee.

变压器室环境与通风示意-4.webp

Load changes the heating, not the meaning of the limit

At fixed conductor resistance, resistive winding loss follows:

Pcu = I²R

A current increase of 10% therefore increases this component of loss by 1.10² = 1.21, or 21%. It does not establish a 21% increase in winding temperature rise. Conductor resistance changes with temperature, core losses remain present while energized, and heat transfer changes with airflow and temperature difference.

A temperature-rise rating is assessed at a defined duty. A short peak and a sustained load may produce different temperatures because the transformer takes time to heat. Any loading beyond the applicable rating requires an assessment of initial temperature, peak duration, ambient conditions and cooling availability. IEC 60076-12 provides the dry-type loading framework for evaluating temperature, loading and insulation ageing; it does not create one universal overload percentage.

For an AN/AF unit, identify the capacity and thermal guarantee for each declared cooling duty. Fans do not establish an additional kVA rating simply by being installed. The guides to AN and AF cooling and dry-type transformer overload capacity address those duty decisions in more detail.

Two further conditions can invalidate a simple nameplate-load comparison. Harmonic currents can change the loss distribution and additional heating, so nonlinear loads require appropriate load information. Installation above the normal 1,000 m altitude basis requires review of cooling performance and the applicable temperature-rise correction. Reduced air density also raises separate dielectric-clearance questions. Neither condition should be resolved by copying a generic loading percentage.

干式变压器温升解析-5.webp

A test result can satisfy the normal limit and still miss the purchase specification

Consider a hypothetical 1600 kVA, Class F, AN-cooled transformer evaluated with the agreed enclosure. Assume the temperature-rise test has reached the required stabilized condition and the following final results have been established using the approved method at the specified rated duty:

Quantity HV winding LV winding
Reference cooling-air temperature 25°C 25°C
Average winding temperature 119°C 121°C
Average winding temperature rise 94 K 96 K

If the applicable normal-condition guarantee is 100 K for both windings, both results satisfy that average-rise criterion. This is not, by itself, a declaration that every other contractual requirement has passed.

If the order instead guarantees 80 K for both windings, neither result meets that requirement without an approved contractual deviation. Quoting the normal Class F limit of 100 K does not override the purchase specification.

The same report does not automatically validate the unit for a 50°C site. Its applicability depends on the design’s declared service conditions and the corrected limits, not merely on the laboratory ambient or the fact that the reported average temperatures are below the insulation-class designation.

This example also shows why “maximum recorded temperature: 121°C” is an incomplete acceptance statement. The reviewer needs the temperature quantity, cooling reference, load duty, measurement method and guaranteed limit.

Ask for evidence that demonstrates temperature-rise performance

IEC 60076-11:2018 distinguishes winding-resistance measurement as a routine test, temperature-rise testing as a type test, and sound-level measurement among its special tests. These classifications should remain clear in the inspection and test plan.

A routine winding-resistance result is not a temperature-rise test. Similarly, FAT describes the agreed factory acceptance scope; it does not automatically mean that every routine, type and special test will be repeated on every ordered unit. Identify whether the project accepts an applicable existing type-test report or requires a new witnessed test, and agree the basis before ordering.

For thermal review, request a report that identifies:

  1. The tested design, rated capacity, relevant winding construction and its applicability to the offered unit.
  2. The cooling mode, fan arrangement where applicable, and whether the enclosure configuration represents the supplied equipment.
  3. The test method, load or loss basis, relevant voltage, frequency and tapping conditions, and any corrections applied.
  4. The cooling-air measurements, thermal stabilization record and final average temperature rise for each winding.
  5. The resistance-measurement locations and the measurement timing or extrapolation used by the selected method.
  6. The agreed acceptance limits, including the project rise guarantee and applicable service-condition corrections.

Measurement location deserves attention when a result is close to its limit. The 2020 interpretation sheet for IEC 60076-11 explains that leadwork and connections included in a remote terminal measurement can affect the inferred winding rise. The arrangement should also preserve representative enclosure cooling during measurement.

Temperature-controller checks answer a different question. Simulating a sensor signal can verify fan-start, alarm and trip functions, but it does not demonstrate winding thermal performance at rated load. Operational setpoints need their own approved basis, accounting for sensor location, insulation system, thermal design and protection coordination.

变压器温升测试评审-6.webp

Make the thermal guarantee specific before approving the datasheet

“Class F, IEC compliant” leaves too much unresolved for a thermally demanding project. The approved datasheet should connect the insulation system and the guaranteed average rise of each winding to the required kVA, cooling duty, ambient profile, altitude, enclosure and load characteristics. The test plan should state how that guarantee will be demonstrated.

If the supplier proposes a deviation, identify what changes with it: allowable output, cooling dependence, enclosure arrangement, loss guarantee or acceptance evidence. A revised number is only useful when its operating conditions are equally clear.

Review your project’s temperature-rise requirement

Send your RFQ or technical datasheet to Henan Huamei Electric Technology Co., Ltd. with the required kVA, HV/LV voltages, frequency, maximum and average ambient temperatures, altitude, enclosure, AN/AF duty and load profile. Include the required winding-rise guarantee and test-document requirements so that thermal assumptions and any technical deviations can be clarified during quotation.

Make an free consultant

Your Name

Phone Number*

Country*

Remarks

reset